Rail Nation Wiki
Advertisement

The Prometheus is the 2nd engine along the 2nd research track in era 3. It is named after the Greek hero. He is suppose to have created man from clay. He also stole fire from the gods and gave it to humans. For this theft, he was bound to a rock where his liver was eaten by an Eagle each day, and would grow back each night.


Prometheus 
Era 3 Short-haul engine
Tractive force: 7 (MAX: 8)
Cross-coupling: +1 💲70,00 13💡
Reliability: 45% (MAX: 65%)
Fork joint: +10% 💲30,000 8💡
BufferBufer: +10% 💲25,000 7💡
Acceleration: 16/20 (MAX: 20/20)
Friction damping: +4 💲20,000 4💡
Max. speed: 80 km/h (MAX: 105 km/h)
Gas spring: +10 km/h 💲60,000 12💡
Piston cooling: +15 km/h 💲80,000 15💡
Research points: 30 💡 (MAX: 89 💡)
Purchase price: 💲350,000 (MAX:💲572,000)
Selling price: 💲245,000 (MAX:💲400,400)
Requirements: Herakles + Boring plugging spindle + Gas strut + Rotary buffer
Research: Gas spring + Cross-coupling + Friction damping + Fork joint (37 💡) » Artemis
🇩🇪 Prometheus - 🇷🇺 Прометей - 🇫🇷 Prométhée - 🇵🇱 Prometeusz - 🇳🇱 Prometheus - 🇨🇿 Prométheus - 🇪🇸/🇲🇽 Prometeo - 🇮🇹 Prometeo

Production series[]

The are three variants of the Prometheus available. The default first one is based on the Series V 200. The second is a different colour scheme Series 200. The 3rd is based on a Series 2TE10L of the Soviet Railways.

Advertisement